Skip to content

Free measure & quoteUp to 3 free samples(03) 8522 8429

Talk to us

(03) 8522 8429info@royalflooring.com.au

Oakleigh East

196 Huntingdale Rd, Oakleigh East VIC 3166

Mon–Fri 9am–5pm; Sat–Sun 10am–4pm

Bayswater

Unit 1/29 Scoresby Rd, Bayswater VIC 3153

Mon–Fri 9am–5pm; Sat–Sun 10am–4pm

Your samples (0)

Difficult jobs

Not a standard floor? Send us photos.

Tell us about the job and attach up to 5 photos.

Warm oak herringbone floor in a bright, timber-lined living space

Jobs we look at

What we check at the measure

  • 01

    Subfloor condition and preparation

    We check the existing material, finished floor height and subfloor condition, and include any required removal or preparation in the quote.

  • 02

    Stairs, access and trims

    We confirm floor area, transitions, access, stairs, skirting or trims.

  • 03

    Over existing tile, concrete or timber

    A floating hybrid floor can often go over sound tile, concrete or timber when the surface is dry, stable and within the manufacturer's flatness tolerance.

  • 04

    Removing the old floor

    Our quotes include removal and disposal of your existing floor.

The process

Three simple steps to your perfect floor

  1. 01We come to youCall us or fill in the form and we'll arrange a free in-home measure at a time that suits you.
  2. 02Clear, all-inclusive pricingA detailed quote within 24 hours. Product, underlay, installation and removal. No hidden costs.
  3. 03Expert installationOur licensed team arrives on time, works cleanly, and leaves your home spotless with a perfect floor.

Common questions

Difficult jobs: FAQs

What happens during an in-home measure?

We confirm floor area, substrate condition, transitions, access, stairs, skirting or trims and likely preparation. Those findings allow the final proposal to reflect the actual installation rather than a rough square-metre estimate.

Does the existing floor need to be removed?

That depends on the existing material, finished floor height and subfloor condition. We check these during the measure and include any required removal or preparation in the quote.

Can you install hybrid flooring over existing flooring?

A floating hybrid floor can often go over sound tile, concrete or timber when the surface is dry, stable and within the manufacturer's flatness tolerance. Carpet must be removed, and we check expansion space, transitions, door height and any acoustic requirements.

How long does installation take?

Most residential installs are completed within one to two days. Larger projects or those requiring significant subfloor preparation may take longer. We'll give you a clear timeframe in your quote and stick to it.

Difficult jobs

Tell us about your job

Describe the space and attach up to 5 photos.